skip to content
CURRENT TEMP 75° FONT SIZE A A A
CURRENT TEMP 75° FONT SIZE A A A
TEMP 75° FONT A A A

TEMP 75° FONT A A A

Road Construction Updates


The Town of Grand Chute Department of Public Works would like to keep you informed of road construction and other projects in the area.  Future projects can be found on the interactive map for planned Capital Improvement Plan (CIP) projects.

Clicking the underlined titles below will direct you to information on the specific project.   
  • 2025 Reclaim and Pave Projects
    • Anticipated Timeline: Completion October 2025
    • Project Description: Pulverizing and paving of the following roadway sections: W. Seneca Dr. (N. Erin Dr. - West Termini), N. Outagamie St. (W. Capitol Dr. - W. Seneca Dr.), W. Seneca Dr. (N. Mason St. - N. Spruce St.), N. Mason St. (W. Hiawatha Dr. - W. Seneca Dr.), W. Brewster St. (N. Colorado Ave. - N. Westfield Dr.), N. Westfield Dr. (W. Brewster St. - 550' North of Brewster St.), and N. Mayflower Dr. (W. Grande Market Dr. - W. Wisconsin Ave.).  Other improvements include culvert replacements and ditching as needed.  The N. Mayflower Dr. project also includes widening work on the north and south sides of the intersection of Mayflower Dr. & W. Wisconsin Ave.to accommodate the addition of turn lanes for future traffic signals to be installed by WisDOT.
    • Group 'A' Project Plans
    • N. Mayflower Drive Plan 
    • Public Informational Meeting
 
  • 2025 CIP Projects
    • Anticipated Timeline: Summer 2025 Construction
    • Project Description: The existing sanitary sewer main is to be upsized along N. Gillett St. (W. Hiawatha Dr. - W. Evergreen Dr.) prior to the I-41 expansion project.  S. Olson Ave. is to be urbanized with curb & gutter and storm sewer main from W. Second St. to W. Fourth St.  W. Glendale Ave. (N. Lynndale Dr. - Michelle Court) is to be repaved, curb & gutter are to be replaced, and the existing water main is to be upsized.
 
  • Evergreen Drive & Galaxy Drive Signalization
    • ​Anticipated Timeline: Fall 2025 Construction
    • Project Description: Installation of a traffic signal at the intersection of W. Evergreen Drive & N. Galaxy Drive.  Existing curb ramps and crosswalks within the intersection to be updated as needed.
 
  • Grande Market Regional Stormwater Facility
    • ​Anticipated Timeline: Pond Construction Fall 2025; Storm Sewer Relay Construction Summer 2026
    • Project Description: Construction of a regional stormwater facility on the north side of Grande Market Drive, to the west of Casaloma Drive.  Existing storm sewer main along West Grande Market Drive, Casaloma Drive, and a storm sewer easement between Casaloma Drive and N. Mall Drive is to be upsized.
 
  • Park Improvements - Maple Edge & Carter Woods
    • ​Anticipated Timeline: Summer/Fall 2025 Construction
    • Project Description: Installation of a shelter with attached restrooms and a parking lot at Maple Edge Park.  Repaving of the pickleball court at Carter Woods Park.
 
  • Ridgeview Drive Area
    • ​Anticipated Timeline: Fall 2025 Construction
    • Project Description: Pulverizing and paving of the following roadway sections: W. Ridgeview Dr. (WIS 47 - Ridgeview Cir), W. Highland Park Ave. (W. Ridgeview Dr. - Ridgeview Cir.), and Appleton St. (W. Highland Park Ave. - Termini).  The following roadways are to be reconstructed and repaved with curb & gutter on one side: Ridgeview Cir. (W. Ridgeview Dr. - W. Highland Park Ave.), W. Highland Park Ave. (Ridgeview Cir. - Appleton St.), Appleton St. (W. Highland Park Ave. - W. First Ave.), and First Ave. (Appleton St. - Town Limits).  Improvements also include culvert replacements and miscellaneous ditching.
 
  • 2025 S. College Avenue Service Road Project
    • ​Anticipated Timeline: July/August 2025
    • Project Description: Pulverizing and paving of the S. College Avenue Service Road from S. Lilas Drive to the railroad crossing approx. 920 feet east of S. Lynndale Drive.  Improvements also include culvert replacements and miscellaneous ditching.
    • S. College Service Rd. Plans
    • S. College Ave. Service Rd. PIM presentation
  
 
HOME GOVERNMENT DEPARTMENTS SERVICES COMMUNITY CALENDAR NEWS CONTACT US
Grand Chute Experience Better
© 2025 Town of Grand Chute
Employee Resources
920-832-1573

Grand Chute Town Hall
1900 W. Grand Chute Boulevard
Grand Chute, WI 54913-9613

Monday through Thursday 7:00 a.m. - 4:30 p.m.
Friday 7:00 a.m - 11:00 a.m.

Designed and Powered by:
Konect
HOME GOVERNMENT DEPARTMENTS SERVICES COMMUNITY CALENDAR NEWS CONTACT US
Grand Chute Experience Better
© 2025 Town of Grand Chute
Employee Resources
920-832-1573

Grand Chute Town Hall
1900 W. Grand Chute Boulevard
Grand Chute, WI 54913-9613

Monday through Thursday 7:00 a.m. - 4:30 p.m.
Friday 7:00 a.m - 11:00 a.m.

Designed and Powered by:
Konect
Expand Nav
Grand Chute Experience Better
© 2025 Town of Grand Chute
Employee Resources
920-832-1573

Grand Chute Town Hall
1900 W. Grand Chute Boulevard
Grand Chute, WI 54913-9613

Monday through Thursday 7:00 a.m. - 4:30 p.m.
Friday 7:00 a.m - 11:00 a.m.
Designed and Powered by:
Konect
Expand Nav
Grand Chute Experience Better
© 2025 Town of Grand Chute
Employee Resources
920-832-1573

Grand Chute Town Hall
1900 W. Grand Chute Boulevard
Grand Chute, WI 54913-9613

Monday through Thursday 7:00 a.m. - 4:30 p.m.
Friday 7:00 a.m - 11:00 a.m.
Designed and Powered by:
Konect